MIME-Version: 1.0 Content-Type: multipart/related; boundary="----=_NextPart_01C46280.14D277D0" This document is a Web archive file. If you are seeing this message, this means your browser or editor doesn't support Web archive files. For more information on the Web archive format, go to http://officeupdate.microsoft.com/office/webarchive.htm ------=_NextPart_01C46280.14D277D0 Content-Location: file:///C:/4F4C8EB3/Inception-2001-CERWASS.htm Content-Transfer-Encoding: quoted-printable Content-Type: text/html; charset="us-ascii" Government of Vietnam

Government of Vietnam        &= nbsp;           &nbs= p;            &= nbsp;   Government of Denmark<= /st1:place>

MARD CERWASS<= span style=3D'mso-tab-count:1'>        &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;         Danida=

 <= /o:p>

 

 <= /o:p>

 <= /o:p>

 <= /o:p>

National= Capacity Building

(MARD-Danida WAterSPS)

Sub-Component 1.2:

Support to Implementation of Natio= nal

Rural Water Supply and Sanitation = Strategy

Inception Report

First Draft

 

 

 

 

 

 

 

 

 

October 2001

104.Vie.814-5


 

 

 

National Capacity Building

(MARD-Danida WAterSPS)<= /p>

Sub-Component 1.2:

Support to Implementation of Na= tional Rural Water Supply and Sanitation Strategy

Inception Report

First Draft

 

October 2001

104.Vie.814-5

 

 

 

 

 

 

Quality Assurance Statement=

 

Version

Status

Date

 

First Draft=

Distributed to R= DE and CERWASS for comment

29/10/2001

 

 

 

 

 

Name

Signature

Date

Prepared by:

Stephen Greenhal= gh

 

24/10/2001

Checked by:=

Lars Skov Anders= en

 

25/10/2001

Approved by:

Stephen Greenhal= gh

 

26/10/2001

Approved by=

Le Van Can

 

 

Key Data Sheet

Location

Hanoi, Social= ist Republic of Vietnam

SPS

MARD-Danida Water Sector Programme Su= pport (WAterSPS)

Component

1.0 = National = Capacity = Building

Sub-component

1.2 Support to Implementation of Nati= onal RWSS Strategy

Implementing Agency

MARD-Centre for Rural Water Supply and Sanitation (CERWASS)

Report

Inception Report

Period

January 2001 – December 2005

Key Events:

Danida Board Decision regarding WAter= SPS of May 11th 2000

Govern= ment of Denmark Parliament Finance Committee approval of WAterSPS July 13th 2000

Prime Minister’s Decision No.104 approving the Strategy signed August 25th 2000

Bilateral Agreement between Governmen= t of Vietnam and Government of Denmark co-signed by Ministry of Planning and Investment and the Royal Danish Embassy on December 1st 2000

Decisi= on No. 1107 assigning MARD as overall responsible for WAterSPS of December 4th 2000

Danida STA mobilised on December 18= th, 2000

Danish Ministry of Foreign Affairs si= gn a 5 year technical assistance contract with Carl Bro a/s to provide a combined input of 177 man months to sub-component 1.2 and component 2 on December 21= st, 2000

Consultants’ team leader mobili= sed on February 7th<= /sup>, 2000

MARD’s Decision No. 2200 QD/BNN= /TCCB nominating CERWASS to implement sub-component 1.2 of May 24th 2001

 

        &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;    

Table of Contents

Key Data Sheet..........................................= ...................................................................... ii

Table of Contents.....................................................................= ..................................... iii

List of Appendices.....................................................................= ..................................... v

Distribution List.....................................................................= ........................................ vi

List of Abbreviations.....................................................................= ............................... vii

Executive Summary.....................................................................= ................................ viii

Enhanced Logical Framework.....................................................................= ................. ix

1   = ;     Introduction..........................................= .................................................................. <= /span>1

1.1     About This Inception Report   &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;       1

1.2     The Rural Water Supply and Sanitation Sector&= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;     2

1.2.1  R= ural Development and the RWSS Situation in Vietnam&= nbsp;           &nbs= p;            &= nbsp;     2

1.2.2  M= inistry of Agriculture and Rural Development (MARD)&= nbsp;           &nbs= p;            &= nbsp;       2

1.2.3  O= ther Relevant Actors      &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;   2

1.2.4  N= ational Target Programme      &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;       3

1.2.5  N= ational Rural Water Supply and Sanitation Strategy&= nbsp;           &nbs= p;            &= nbsp;           4

1.2.6  D= anida Assistance      &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;        4

1.2.7  Ot= her Donor Assistance      &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;             = 4

1.3     Capacity Building        &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;      5

1.3.1  V= ision        &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;  5

1.3.2  O= pportunities        &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;   6

1.3.3  B= arriers        &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            6

1.3.4  C= hallenges and Approaches      &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;      7

1.4     Basis        &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;            7

2   = ;     The Logical Framework..............................= .......................................................... PAGEREF _Toc528898126 \h = 9

2.1     Elements of a Logical Framework   &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;         9

2.2     The LFA for Sub-Component 1.2   &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;         10

2.2.1  C= hanges in the Project Environment   &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;      10

2.2.2  E= nhancing the LFA for Sub-Component 1.2   = ;            &n= bsp;            = ;            &n= bsp;        10

2.3     The LFA for the Strategy Action Plan   = ;            &n= bsp;            = ;            &n= bsp;            = ;            &n= bsp;    11

2.4     Coordinating the Strategy Action Plan   &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp; 12

3   = ;     Objectives and Approach..............................= ..................................................... 15

3.1     Objectives        &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;  15

3.2     Approach        &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;    16

3.2.1  G= eneral        &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;          16

4   = ;     Outputs and Activities..............................= .......................................................... PAGEREF _Toc528898137 \h = 19

4.1     Scope of Work        &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;        20

4.1.1  O= utput 1 NRWSS Office Established in CERWASS   = ;            &n= bsp;            = ;       20

4.1.2  O= utput 2 Improved Awareness and Acceptance of NRWSS at all Relevant Levels. 20

4.1.3  O= utput 3: Improved Awareness for User Groups/User Organisations         20

4.1.4  O= utput 4: National Fund for RWSS Established on Pilot Basis&= nbsp;           &nbs= p;       21

4.1.5  O= utput 5: Study of Institutional Development and Organisational and HRD Requiremen= ts         = 21

4.1.6  O= utput 6: HRD Programme Implemented   &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;          <= !--[if supportFields]> PAGEREF _Toc528898144 \h = 21

4.1.7  O= utput 7: Institutional and Organisational Development Plan and Programme     22

4.1.8  O= utputs 8 and 10: “New Concepts and Procedures (Developed and Incorporated in Design of Pilot Projects)” and “Design of Second Generation of Pilot Projects”   &nbs= p;  22

4.1.9  O= utputs 9 and 11: “Lessons Learnt from First Generation of Pilot ProjectsR= 21; and “Documentation of Lessons Learnt from Second Generation of Pilot = Projects”    22

4.1.10   &nbs= p;     Output 12: Plan for nationwide replication with adjustments for lessons learnt     23

4.2     Enhanced Narrative Description for Sub-Component 1.2&= nbsp;           &nbs= p;            &= nbsp;            23

5   = ;     Inputs..........................................= .......................................................................... = 25

5.1     Danida        &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;        25

5.1.1  I= nternational Consultants      &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;          25

5.1.2  O= perational Costs        &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;     26

5.1.3  N= ational Technical Assistance   &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;   26

5.1.4  N= ational Staff        &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p; 26

5.1.5  T= ravel and Transport      &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;   26

5.1.6  O= ffice Equipment and Cars   &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;        26

5.1.7  C= ERWASS HRD        &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;       27

5.1.8  I= nformation        &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;     27

5.1.9  W= orkshops and Conferences      &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;  27

5.2     Government of Vietnam      &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;        27

6   = ;     Assumptions..........................................= ............................................................... 28

7   = ;     Indicators and Means of Verification...............= ................................................. 30

8   = ;     Organisation..........................................= ............................................................... 33

8.1     Strategy Coordination Office   &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;    33

8.2     Informal Coordination and Working Groups   = ;            &n= bsp;            = ;            &n= bsp;            = ;      34

8.2.1  R= WSS Coordination Committee   &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;             = 34

8.2.2  W= orking Groups and Task Forces   &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;          35

9   = ;     Sub-Component Implementation Plan...............= ............................................... 36

9.1     5-Year Plan        &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;             = 36

9.2     Plan for 2001        &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;           37

9.3     Plan for 2002        &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;           37

10   = ;   Budget..........................................= ........................................................................ 39

10.1   5-Year Budget        &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;         40

10.2   Budget for 2001        &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;            &= nbsp;           &nbs= p;       41

 

= List of Appendices

Appendix= 1:      Orig= inal Logical Framework

Appendix 2:      Func= tions of CERWASS

Appendix 3:      Appr= oach to Capacity Building

Appendix 4:      Enhanced C= ERWASS Organisation Structure

Appendix 5:      Updated Job Description for the Danida STA

Appendix 6:      Draft Job Description for the Carl Bro Team Leader / Community Development and IEC Specialist

Appendix 7:      Functions = of the NSC and the CPMU

Appendix 8:      Plan= ned Activities Second Half 2001

 

 

Distribution List

Recipient

English=

Vietnamese

National Steering Committee (NSC)

-

12

Ministry of Agri= culture and Rural Development (MARD)

1

1

Central Programme Management Unit (CPMU)

2

2

Royal Danish Embassy (RDE)

2

2

Provincial Programme Coordination Uni= t Dak Lak

1

1

Provincial Programme Coordination Uni= t Ha Tinh

1

1

Provincial Programme Coordination Uni= t Nghe An

1

1

Carl Bro Interna= tional

2

-

Centre for Rural= Water Supply and Sanitation (CERWASS)

5

10

2.1 pCERWASS Dak= Lak

-

1

2.2 pCERWASS Ha = Tinh

-

1

2.3 pCERWASS Ngh= e An

-

1

Donors (AUSAID; = JICA; Unicef)

3

-

 

List of Abbreviations<= span lang=3DEN-GB>

 

 

AUSAID

Australian Development Assistance

Danida

Danish International Development Assi= stance

DARD

Department of Agriculture and Rural Development

DFID

Department for International Developm= ent

EOPI

End of Project Impact

ICD

International Cooperation Department<= /span>

LFA

Logical Framework Approach

MARD

Ministry of Agriculture and Rural Dev= elopment

MoC

Ministry of Construction

MoF

Ministry of Finance

MoH

Ministry of Health

MoLISA

Ministry of Labour, War Invalid and S= ocial Affairs

MOSTE

Ministry of Science, Technology and Environment.

mm

Man Month

MPI

Ministry of Planning and Investment

NTP

National Target Program

pCERWASS

Provincial Centre for Rural Water Sup= ply and Sanitation

PPCU

Provincial Programme Coordination Uni= t 

RWSS

Rural Water Supply and Sanitation

QQT

Quantity, Quality and Time

TNA

Training Needs Assessment

VBA

Vietnam Bank for Agriculture and Rural Development

VWU

Vietna= m Women Union

WAterSPS

Water Sector Programme Support=

WATSAN

Water and Sanitation

WUG

Water User Group

Executive Summary

This inception report covers adju= stments to the logical framework, five year planning, overall approach and budgets = of the WaterSPS sub-component 1.2: Support to Implementation of the National R= ural Water Supply and Sanitation Strategy. It also updates the sector background= notes presented in the sub-component description.

It is necessary to review the ori= ginal logical framework in the sub-component description in the light of progress within RWSS in Vie= tnam since the formulation of the sub-component description. The e= nhanced logical framework for the sub-component is presented below and the key chan= ges to the design of the sub-component include:

Enhanced Logical Framework=

Enhanced

Narrative Description=

Updated

Verifiable Indicators=

Updated

Means of Verification=

Immediate Objective:

A strengthened CERWASS able to coordinate the implementation of the Strateg= y

 

National RWSS programme for 2006-2010, based on Strategy principles, approved in 2= 005

 

Decisions of MPI and MoF and minutes of the steering board of the national fund for RWSS

WAterSPS “Output” 1

Strategy coordination office established in CERWASS

 

Inception report, work plans for 2002 and consultant’s QA plan approved by NS= C in Jan 2002

 

Minutes of NSC

 

WAterSPS “Output” 2

Awareness and acceptance of Strategy at all relevant levels

 

Strategy action plan pilot provinces’ RWSS plans include Strategy principles= by Oct 2002

 

Comparison and analysis of proposals submitted to NTP by all provinces in Oct 2002

WAterSPS “Output” 3

Raised awareness of Strategy procedures and the roles and responsibilities of wa= ter user organizations at provincial level

 

Strategy action plan pilot provinces support the formation of water user groups fr= om mid-2002 onwards

 

Provincial records of water user groups registered

WAterSPS “Output” 4

National fund for RWSS, established on pilot basis in selected provinces

 

Some Strategy action plan pilot provinces have functioning loan guarantee fund= s by mid-2002

 

VBA records at provincial level

WAterSPS “Output” 5

Institutional Development, Organisation Strengthening and HRD plans completed

 

ID/OS and HRD plans approved by CERWASS management by early 2002

 

Published document

WAterSPS “Output” 6

HRD programme implemented

 

New units in CERWASS able to implement planned activities

 

Progress reports

WAterSPS “Output” 7

Institut= ional Development and Organisation Strengthening plan implemented

 

Quality management plan being implemented by CERWASS from early to mid-2002 =

 

Progress reports

WAterSPS “Output” 8

New concepts, guidelines and procedures developed and incorporated in design = of RWSS projects

 

Strategy action plan pilot provinces agree on a framework for demand responsive projects by mid-2002

 

Published document

WAterSPS “Output” 9

Lessons learnt from the “pioneer Strategy projects” in few communes documented.

 

Evaluation report on “Strategy pioneer projects” in selected provinces by early 2002

 

Published document

WAterSPS “Output” 10

Strategy action plan pilot provinces incorporate Strategy principles in the design= of their RWSS projects

 

Guidelines published and best practice documented on an on-going basis from mid-2002=

 

CERWASS website

WAterSPS “Output” 11

Lessons learnt from Strategy action plan pilot provinces documented at national l= evel

 

Best practices toolkits on CERWASS website updated regularly from Feb 2002

 

Number of “hits” on CERWASS website

WAterSPS “Output” 12

Plan for nationwide replication of the Strategy

 

Phase II of the Strategy action plan proceeds by start of 2004

 

Minutes of inter-ministerial Strategy steering committee

 


1&nb= sp;            =           Introduction

1.1&= nbsp;           &nbs= p;  About This Inception Repo= rt

This inception report covers adju= stments to the logical framework, five year planning, overall approach and budgets = of the WaterSPS sub-component 1.2: Support to Implementation of the National R= ural Water Supply and Sanitation Strategy. It also updates the sector background notes presented in the sub-component description.

Activities undertaken during the inception phase are described in Progress Report No. 1 covering the period January – June 2001. Detailed work plans and budgets for 2002 will be prepared under a separate document.

This first draft of the inception= report was prepared by the sub-component manager and the Danida STA in close collaboration with the sub-component director and is based on discussions h= eld with CERWASS staff, national and international consultants and donors during the inception phase.

The final draft of the inception = report will incorporate comments on the first draft received from CERWASS internal meetings and from other key sector stakeholders that participate in the sub-component Inception Workshop.

The inception report is divided i= nto 10 sections as follows:

1.2&= nbsp;           &nbs= p;  The Rural Water Supply and Sanitation Sector

1.2.1             Rural Development and the= RWSS Situation in Vietnam

According to the Strategy documen= t, 75% of the population live in rural areas and agriculture remains a key element= in the national economy. People in rural areas are, however, generally poor and with the economic renovation policy they tend to fall behind urban people, = both in relative economic development and in overall quality of life.

Most households use individual wa= ter supply facilities that they have constructed themselves. Figures from 1997 indicated that 50% of households had access to water supply systems that met their basic domestic requirements, however only around 10% of households had access to water that meets the national drinking water standards.

Similarly, at the same time, only= about 50% of rural households had some form of latrine and of these very few were hygienic. The reuse of fresh excreta remains common. Only a few people have good personal hygiene practices and, in general, people have low awareness = of, and pay little attention to the relation between water supply, latrines, personal hygiene practices and health.

1.2.2             Ministry of Agriculture a= nd Rural Development (MARD)

Pursuant to = the Prime Minister’s decision No. 104/2000/QD-TTG of August 25th, 2000, MARD is as= signed to assume the prime responsibility for the National Rural Water Supply and Sanitation Strategy (henceforth referred to as “the Strategy”) = up to the year 2020. Specifically MARD is to coordinate with other Ministries = and Provincial People’s Committees (PPCs) to implement the Strategy. The Prime Minister’s decision also requires MARD to expand promptly the composition of the management board of the National Target Programme (NTP) = for RWSS to include competent representatives of concerned ministries.

RWSS is not represented at department level within MARD, but is both managed and implemented by the Centre for Rural Water Supply and Environmental Sanitati= on (CERWASS). CERWASS was originally established within the Ministry of Labour, Invalids and Social Affairs (MOLISA) as a counterpart agency to UNICEF for = the implementation of a RWSS (WatSan) programme. With the recent focus on RWSS, CERWASS has become increasingly involved in policy formulation and programme preparation. The functions of CERWASS are detailed in appendix 2

At the provi= ncial level the functions of MARD are undertaken by a Department of Agriculture a= nd Rural Development (DARD) which administratively belongs to the PPC. Technic= ally DARD is responsible that the decisions, regulations, standards and guidelin= es of MARD are adhered to.

Provincial C= ERWASS offices, reporting to DARDs, have been formed in all 61 provinces. The pCER= WASS offices are responsible for the implementation of the NTP, which includes t= he Unicef co-funded WatSan elements and other donor funded activities. Typical= ly, a pCERWASS would prepare the provincial (and district and commune level) an= nual action plan for the development and installation of RWS schemes and sanitat= ion facilities.

1.2.3             Other Relevant Actors

The Ministry of Planning and Inve= stment (MPI) and Ministry of Finance (MoF) are responsible for overall co-ordinati= on of funding and donor inputs and provide the annual government budget for the sector.

The Ministry of Health (MoH) is responsible for monitoring and control of domestic water quality as well as= for the enactment of public health regulations including promotion of household hygiene and sanitation. MoH has staff at all levels, who are engaged in many preventive and curative activities, whereas the capacity and capability to undertake and enforce control of drinking water quality is weak. IEC activi= ties are carried out by village health workers at grass-roots level in collabora= tion with local authorities and mass organisations. There is an ongoing reorientation towards more and more participatory approaches. 

Mass Organisations (Vietnam Women= ’s Union; Farmers Union, the Veterans Union, the Youth Union, the Pioneers and others) all have a potential to assist in promotion of hygiene, sanitation and wate= r. Collaboration with a wide range of mass organisations has the advantage of increasing the public awareness on water supply and sanitation issues.

Provincial government institutions have traditionally covered all sector activities including planning agencies, management companies, engineering design institutions and commercial construction and manufacturing companies. Refor= m of the state administration has given these institutions increasing autonomy w= ith responsibility to generate their own income.

The private = sector is vibrant with small companies and individuals providing important services such as stocking and distribution of sanitary hardware as well as providing pipes and pumps for water supply. Craftsmen and small contractors are engag= ed in borehole drilling, digging wells and installation of simple water and sa= nitation facilities. Small consultancy companies providing design services are emerg= ing for urban infrastructure, including water supply. The development of a larg= er more formalised private sector is likely to grow and become more and more significant in the future, partly as a result of the change from a supply driven to a demand responsive approach advocated by the Strategy.

Consumers an= d users of RWSS services are at the core of the sector. In effect, the sector is defined by the many daily decisions made at this level much more than by po= licy statements or institutional arrangements at a higher level. In principle, consumers and users are responsible for paying for the facilities and ensur= ing that they are operated and maintained. In the rural situation, water supply= and sanitation is sometimes a village level activity but more usually it is an individual household responsibility especially where point source water sup= ply and on site sanitation is used.

1.2.4             National Target Programme=

GoV supported RWSS activities are implemented under the NTP created by the Prime Minister’s Decision no= 237 of December 5, 1998. MARD is responsible for the management of the NTP and = is the main coordinator of the involvement of different line ministries and lo= cal government authorities.

CERWASS is responsible for assist= ing MARD in the implementation of the NTP. The NTP is designed as an umbrella progra= mme to include all ongoing and planned GoV projects as well as Unicef and other donor supported activities including the WAterSPS RWSS component. The NTP is gradually introducing the principles of the Strategy.

The NTP has a rather strong focus= on water supply and sanitation service delivery and on achievement of physical targets. The NTP in general concentrates on improving water supply and sanitation in areas with water shortage and highly polluted water sources a= nd gives particular attention to remote and mountainous areas as well as areas populated by ethnic groups. Moreover, the registered 1,000 poorest communes receive specific attention.

With regard to cost, the NTP focu= ses equally on provision of water supply and sanitation. GoV subsidies are prov= ided under an inter-ministerial circular of August 1999. The following are impor= tant aspects of the NTP:

1.2.5             National Rural Water Supp= ly and Sanitation Strategy

The Strategy introduces a radical= change away from a supply-driven, top-down approach to a demand responsive, participatory approach. Within this new approach users will be supported to select from a range of technical options and to organise the construction of their own facilities with advice and assistance from provincial and district authorities. Users are also expected to pay most of the capital construction costs (with the exception of the very poor) as well as all operation and maintenance costs. In order to build up capacity and stimulate the demand responsive approach, a comprehensive IEC element is included in the Strateg= y. Financial support, comprising of grants and loans, is also embraced by the Strategy.<= /span>

1.2.6             Danida Assistance<= /a>

Denmark has provided assistance t= o the water sector in Vietnam since 1974. From 1993 the assistance has expanded gradually to include both water resources management, RWSS and UWSS. From 1997-1999 Denmark provided financial and technical assistance for a Strategy study. A pilot project to test the principles of the Strategy was undertaken with Danida funding from 1998 to 2000 in Cam Xuyen district in Ha Tinh province. Furthermore, Unicef received a DKK 3 million grant from the RDE in 2000 to develop projects in Thua Thien Hue and Quang Binh provinces to test= the Strategy: this work is on-going.

In December 2000, a five year WAt= erSPS was signed by the Governments of Vietnam and Denmark. Support to the RWSS sector is provided under:

1.2.7             Other Donor Assistance

Unicef works through CERWASS and = has been the principal donor in the RWSS sector since 1982. It has made a major cont= ribution to introducing new technologies, increasing the coverage of RWSS as well strengthening the national capacity to implement hardware as well as softwa= re aspects. Unicef works within the framework of the NTP and supports the Strategy.

From 2002 the UK Department for International Development (DFID) will end its support to the RWSS sector through Unicef. DFID will focus their support instead on bi-lateral rural development projects in three Northern provinces.

Australian AusAid recently signed= an agreement with the GoV to provide bilateral support to RWSS projects in five province= s in the Mekong Delta. AusAid supports the Strategy and is keen to collaborate w= ith CERWASS.

The Japanese International Cooper= ation Agency (JICA) intends to finance a number of rural and small towns piped wa= ter schemes in several regions, including the Central Highlands. JICA has shown much interest in the Strategy.

The Netherlands Government channe= ls limited funds through Unicef.

The World Bank and the Asian Deve= lopment Bank have positively indicated that they would consider funding RWSS activi= ties after year 2003. Although the two banks have expressed general support to t= he Strategy, it is not yet clear to what extent they intend to follow the Strategy. Presently both agencies fund water supply projects in small towns= and as part of integrated rural development projects. As these projects were initiated before the Strategy was developed and/or RWSS forms only a small = part of the projects, they do not presently follow the underlying principles of = the Strategy.

The UNDP/World Bank Water and San= itation Programme is providing minor, but strategically important inputs to the development of the RWSS sector and have supported the preparation of "draft guidelines for preparing, implementing and operating a community based clean water and sanitation improvement plan" as well as brochure= s on informed choice for water and sanitation options.

WHO is assisting the MoH with IEC activities of importance in connection with the implementation of the Strat= egy. This includes the Health Promoting Schools Programme, to be piloted in Ha T= inh and Haiphong, where teachers will receive training and also teaching materi= als to improve health education. Furthermore, WHO is providing training to heal= th staff in the use of participatory approaches and tools, including the PHAST (Participatory Hygiene And Sanitation Transformation) approach developed and promoted through joint collaboration with UNDP/World Bank and WHO since 198= 3.

1.3&= nbsp;           &nbs= p;  Capacity Building<= /a>

1.3.1          &= nbsp;  Visi= on

The vision f= or sub-component 1.2 of the WAterSPS national capacity building component is t= hat Vietnam in five years will have a working national legislative and administrative framework for the RWSS sector served by well functioning ins= titutions for RWSS service delivery that can provide effective support to management = and implementation at provincial levels.

Specifically= , the vision for the support to the implementation of the Strategy at national le= vel is that this will contribute to a greater capacity within CERWASS to coordi= nate and assist provinces to implement the Strategy action plan.

1.3.2          &= nbsp;  Oppo= rtunities

The Strategy constitutes a new approach to water service delivery in Vietnam, replacing supply driven projects with a demand responsive approach that puts the user= or user organisations in focus in the selection of service levels and in construction, operation and maintenance of RWSS facilities. The Strategy is well timed with the redirection of Government priorities towards socializat= ion as well as hunger eradication and poverty reduction in rural areas.

Capacity bui= lding will speed up the implementation of the Strategy. In addition to the tangib= le benefits to the rural poor (improved domestic water supply and sanitation),= the introduction of the Strategy provides opportunities to promote sustainabili= ty, equity and rational governance in RWSS service delivery. =

1.3.3          &= nbsp;  Barr= iers

Although the Strategy was approved in August 2000, MARD has to date not formally started= to coordinate its implementation. Without a clear mandate from MARD, CERWASS is unable to effectively coordinate with other line ministries or mass organizations. This matter was raised in the first meeting of the WAterSPS National Steering Committee in August 2001 and it w= as noted in the minutes that “the current implementing agency is CERWASS, now MARD is reviewing the institutions and will make a decision soon”= .

CERWASS head= office has 47 employees (of which 35 are permanent staff). Of these, 15 perform administration and accounting duties and 32 have a professional function and carry out the planning, monitoring, reporting and research of the RWSS sect= or on behalf of MARD. The CERWASS Station for Technology Transfer and Material Supply is managed by two CERWASS staff and currently employs up to 45 profe= ssional and support staff from the open market on long and short term contracts. Mo= st of the staff at the station are, however, made up of graduates and young professionals and few of them have experience with the implementation of the new concepts and approaches of the Strategy. Furthermore, without any guaranteed income, CERWASS may not be able to retain these young profession= als, even in the short term.

Given the cu= rrent workload on the staff in CERWASS, the additional challenge of coordinating = the implementation of the Strategy is a daunting prospect. It is vital therefore that CERWASS’ future mandate, roles and responsibilities are clearly defined before embarking on a major effort in terms of organisation and hum= an resource development. It is clear, however, that CERWASS will be an enabler rather than a provider of services and it will need to contract in much of = the specialist expertise to develop the tools and instruments it will need to coordinate the implementation of the Strategy, at least in the initial stag= es of the proposed Strategy action plan.

CERWASS also= has a significant constraint in physical office space. Several options have been identified but there is no immediate solution in sight.

The top-down approach in the previous planning and management of RWSS services means that the central level has a near monopoly on planning skills. CERWASS needs to provide guidance to the provinces in this direction as it will be a prerequisite for the successful implementation of the Strategy.<= /span>

The RWSS sec= tor has historically been seriously under financed: current GoV and donor annual funding provides only around 10% of the estimated annual investment needed = to meet the targets set in the Strategy. Probably, the only way to meet these targets is to draw on the internal strength of the people, who have demonstrated a strong tradition to take hand of their own future when government investments have failed to materialize. The development and institutionalization of a national RWSS fund (combining credit and grants f= or the poor) would further enhance the efforts of rural people.

1.3.4          &= nbsp;  Chal= lenges and Approaches

The immediate capacity building challenge facing the implementation of the Strategy revol= ves around the need to empower CERWASS and deepen the internal and external und= erstanding of the Strategy’s underlying principles e.g. demand responsive approa= ch and innovation in financing rural infrastructure.

At a later s= tage the challenge will be to build up a self critical and learning capacity within = the relevant organizations, so that lessons from pilot projects and future implementation can be gathered and used to improve future efforts.

For the WAte= rSPS the main principle will be to focus on learning processes rather than training delivery, by putting the learner – be it an institution or an individ= ual – at the centre. GoV staff and professionals are highly motivated and eager for knowledge and access to new skills. A focus on learning processes places responsibility for learning on the institutions and individuals and there is abundant evidence that this approach will meet with success. In practice this means that training should be user defined, should not be prescriptive and should explicitly seek to draw value from the many learning opportunities that can be provided as a result of on the job exposure, coac= hing and mentorship.

There are ma= ny capacity building tools and approaches that can be used depending on the circumstances and situation and a list of 27 tools and approaches were described in the sub-component description. The Carl Bro proposal for “support to implementation of rural water supply and sanitation, Vietnam”, summarises many of these tools and approaches into a relati= vely few key principles. Given that capacity building is the basic principle beh= ind all of the activities to be developed with support from the sub-component, = the relevant sections from the consultant’s proposal are reproduced in appendix 3.

1.4&= nbsp;           &nbs= p;  Basis

The WAterSPS is the umbrella for Danish–Vietnamese development cooperation in the water sector and is governed by a bilateral agreement between the Government of Viet Nam and the Government of Denmark, co-signed by the Ministry of Planning and Investment= and the Royal Danish Embassy on December 1st 2000. Annual bilateral consultations between the MPI and the RDE will determine the overall struct= ure and scope of the WAterSPS both in relation to activities in other sectors a= nd in the water sector.

Specifically the WAterSPS compris= es the Danish grant assistance to capacity building and implementation of national sector programmes that are given high priority by the Government of Viet Nam and which concur with the overall policies for Danish development assistanc= e.

The WAterSPS is however also inte= nded as the focal point of other types of Danish assistance to the water sector, for instance concessional loans (through the Danish mixed credit schemes), the programme for Enhanced Research Capacity (ENRECA) and Danida core funding to regional and global institutions cooperating with Vietnam, such as the Asian Institute of Technology (AIT), the International Water Management Institute (IWMI) and the Global Water Partnership (GWP).

The legal foundation of the WAter= SPS comprises of the legal agreements and documents as follows:

2&nb= sp;            =           The Logical Framework

The sub-component is designed in accordance with the logical framework approach (LFA) to project planning. <= /span>

2.1&= nbsp;           &nbs= p;  Elements of a Logical Fra= mework

The LFA is a tool to help strengt= hen project design, implementation and evaluation. The LFA has been widely adop= ted by many donors, including Danida, within the sphere of development cooperat= ion, to describe a project, its intended impact and the external environment in which it is implemented.

A logical framework should be a s= ummary of a project that, in a few simple concise statements (using strong action verbs), places objectives in a hierarchy based on cause and effect. Objecti= vely verifiable indicators that are described in terms of quantity, quality and = time are used for performance measurement and, together with their means of verification (sources of data needed to verify the status of indicators), provide the basis for project monitoring, reporting and evaluation. Finally, external factors and risks outside of the control of the project are expres= sed as positive conditions, i.e. assumptions important for the success of the project.

A project’s immediate objec= tive is the primary reason for doing the project and provides the motivation for producing outputs. The immediate objective very often defines the change in= the way institutions function (or the change in the behaviour of project beneficiaries) as a result of the project’s outputs. The objectively verifiable indicator at the immediate objective level defines the end of project impact (EOPI) The EOPI (which should be stated simply and easily grasped) should be motivational and should orient output action so as to re= sult in the desired immediate objective.

Project outputs must be clearly s= tated as results. Outputs are the deliverables of the project. Only those outputs wh= ich directly contribute to the achievement of the immediate objective should be included in the project design. Outputs should not be used as a measure of success (indicator) at the immediate objective level.

To be useful, indicators must des= cribe levels of achievement that must be specifically defined in terms of QQT, i.= e. by how much (Quantity); by how well (Quality) and by when (Time). Indicators should monitor only what is important. The process of defining indicators forces the clarification of project objectives.

Assumptions describe conditions o= utside the influence of the project that must be fulfilled for the project to proc= eed successfully.

2.2&= nbsp;           &nbs= p;  The LFA for Sub-Component= 1.2

2.2.1             Changes in the Project Environment

It is necessary to review the ori= ginal logical framework in the sub-component description in the light of progress within RWSS in Vietnam since the formulation of the sub-component descripti= on and the experience gained during the extended inception phase of the WAterS= PS. Major recent developments in RWSS in Vietnam include:

2.2.2             Enhancing the LFA for Sub-Component 1.2

In general, the original logical framework for sub-component 1.2 (Appendix 1) does not describe a logical development assistance project design for the following reasons:

-&nb= sp;           the immediate objective i= s only to “assist” and there is no indication in the assumptions, at t= he output level, of what additional outputs need to be generated and by whom

-&nb= sp;           the first indicator at immediate objective level describes a situation that should be achieved one year before “outputs” 11 and 12 even begin, when actually it wi= ll only be possible at least two years after output 12 is finalised

-&nb= sp;           the second and third indi= cators (there should only be one) at the immediate objective level are reformulati= ons of outputs 4 and 6

-&nb= sp;           the outputs (except outpu= t 4) are not stated as results and can be better described as activities (e.g. “outputs” 1, 2, 5, 6 and 7, as activities, would contribute to “increased organisation capacity”)

Some specific problems with the o= riginal logical framework design include:

2.3&= nbsp;           &nbs= p;  The LFA for the Strategy = Action Plan

The WAterSPS must operate within a logical framework that can achieve the desired results and impact. Therefor= e, in order to ensure that the Strategy will be operational by the end of 2005= and fully incorporated into a national plan by all provinces for the period 2006-2010 in order to meet the objectives set out in the strategy, the WAte= rSPS should work within a logical framework to be coordinated by CERWASS that has the support of the GoV, a number of pilot provinces as well as donors.

The Strategy action plan, as desc= ribed in the approved Strategy document, represents the most obvious base on which to build such a national logical framework.

The Strategy action plan identifi= es nine thematic areas, which in the Strategy study are grouped under four componen= ts (capacity building; IEC, finance mechanism and technical solutions). In this context (Box 2.1), the sub-component “outputs” can be seen to be activities.

The tentative hierarchy of object= ives outlined in Box 2.2 is a first draft for the Strategy action plan based on = work carried out during the preparation of the Strategy study on which the Strat= egy is based.

The process of developing the fin= al hierarchy of objectives, defining indicators, identifying the roles and responsibilities of stakeholders and reaching agreement on a final version = of the logical framework for the Strategy action plan will be one of the first planned participatory planning exercises that CERWASS will conduct with oth= er line ministries once it has received a mandate from MARD to coordinate the implementation of the Strategy.

The final outputs and output level indicators for the logical framework for the Strategy action plan therefore cannot be finalised at this stage.

One advantage of using the output= s and output indicators from the logical framework for the Strategy action plan is that it will facilitate the monitoring of the WAterSPS contribution to the achievement of national objectives.

2.4&= nbsp;           &nbs= p;  Coordinating the Strategy Action Plan

Decision no. 104 of the prime min= ister of August 2000, assigns MARD to assume the prime responsibility, and to coordi= nate with other ministries and people’s committees, in implementing the Strategy till the year 2020. In the minutes of the first meeting of the NSC= in August 2001 vice minister Nguyen Dinh Thinh indicated that “CERWASS i= s the current implementing agency and that MARD is currently reviewing the institutions and will make a decision soon”.

Without a formal mandate from MAR= D it is not possible for CERWASS to co-ordinate the implementation of the Strategy = with other ministries.


 

Box 2.1: Sub-Component “Outputs” in Relation to Components in the Strategy Study and Thematic Areas in the Strategy Action Plan

 

IMMEDIATE OBJECTIVE:   Strategy Operational Throughout Vietnam by 2006

 

COMPONENT I:&nbs= p;    Capacity Building

&n= bsp;

     Area 2.   Organisational strengthening and management capacity building

&n= bsp;

        &= nbsp;          “O= utput” 01:    Establish NRWS= SS coordination office

        &= nbsp;          “O= utput” 02:    Awareness and acceptance of NRWSSS

        &= nbsp;          “O= utput” 05:    Study of institutional and organisational development

        &= nbsp;          “O= utput” 07:    Institutional = and organisational development plan

        &= nbsp;          “O= utput” 08:    New concepts a= nd procedures (first generation)

        &= nbsp;          “O= utput” 10:    New concepts a= nd procedures (second generation)

&n= bsp;

     Area 3.   Drafting and promulgation of legisl= ative documents

&n= bsp;

     Area 4.   Planning

&n= bsp;

     Area 5.   HRD

&n= bsp;

        &= nbsp;          “O= utput” 06:    HRD programme<= /span>

&n= bsp;

     Area 8.   Establishment of common database fo= r RWSS

&n= bsp;

     Area 9.   Expansion of international cooperation

 

COMPONENT II:&nb= sp;        IEC

&n= bsp;

     Area 1:   Approach tested/developed for a demand responsive NRWSS program

&n= bsp;

        &= nbsp;          “O= utput” 03:    Improved aware= ness for user groups

        &= nbsp;          “O= utput” 08:    New concepts a= nd procedures (first generation)

        &= nbsp;          “O= utput” 10:    New concepts a= nd procedures (second generation)

 

COMPONENT III:&n= bsp;  Finance Mechanism

&n= bsp;

     Area 6:   Financial mechanism and mobilizatio= n of capital sources in society.

&n= bsp;

        &= nbsp;          “O= utput” 04:    National fund = for RWSS established on pilot basis

 

COMPONENT IV:&nb= sp;  Technical Solutions

&n= bsp;

Area 7:=    Research & development and application of appropriate technologies

&n= bsp;

        &= nbsp;          “O= utput” 08:    New concepts a= nd procedures (first generation)

        &= nbsp;          “O= utput” 10:    New concepts a= nd procedures (second generation)

 

Sources:    NRWSS Strategy study, v= olume 3, March 1999; Action Plan in NRWSS Strategy, August 2000;         &= nbsp;           &nbs= p;           and WAterSPS sub-component 1.2 description

 


Box 2.2: Tentative Hierarchy of Objectives for the<= /span>

Strategy Action Plan for the Period 2002-2005

 

Development Objective:     &nb= sp;    Improved Access to and Equity in RWSS Service Delivery

Immediate Objective:            = ;  Strategy Operational Throughout Vietnam by 2006

Output 1:     Capacity Building Component

      Activity 1.1 Public Sector Organisation, Regulation and Management=

            =             &nb= sp;            =         1.1.1 Adjust Mandates & Organisational Structure of the Sector

            =             &nb= sp;            =         1.1.2 Improve National & Provin= cial Legislation/Regulations

            =             &nb= sp;            =         1.1.3 Improve Enforcement Structure= s and Procedures

            =             &nb= sp;            =        1.1.4 Improve Programme Management<= o:p>

            =             &nb= sp;            =         1.1.5 Improve Strategy and Programme Monitoring

      Activity 1.2 Development of HRD Activities

            =             &nb= sp;            =         1.2.1 Preliminary HRD Needs Assessm= ent

            =             &nb= sp;            =         1.2.2 Implement HRD Plan to Meet Ur= gent Needs

            =             &nb= sp;            =         1.2.3 Implement a Comprehensive HRD= Plan

      Activity 1.3 Management of Shared Water Supply Facilities

            =             &nb= sp;            =         1.3.1 Review Existing Situation

            =             &nb= sp;            =         1.3.2 Develop Guidelines for Shared= RWS Facilities

Output 2:     Informati= on, Education and Communication Component

      Activity 2.1 Overall IEC Approach and Guidelines

            =             &nb= sp;            =         2.1.1 and 2.1.2 Develop IEC Approac= h at National/Provincial Level

      Activity 2.2 Face-to-Face Information, Education and Communication=

            =             &nb= sp;            =         2.2.1 Develop New IEC Materials

            =             &nb= sp;            =         2.2.2 Train RWSS Motivators

            =             &nb= sp;            =         2.2.3 Train Commune and Village Hea= lth Staff

            =             &nb= sp;            =         2.2.4 Establish District Advisory C= entres

      Activity 2.3 Mass Communication and National Campaigns

            =             &nb= sp;            =         2.3.1 Develop Guidelines for Use of= Mass Media

            =             &nb= sp;            =         2.3.2 Implement Plan for Mass Media Campaigns

      Activity 2.4 Improved Health Education in Schools

            =             &nb= sp;            =         2.4.1 Develop Health Education Plan=

            =             &nb= sp;            =         2.4.2 Assist Mass Organisation with Health Education in School

      Activity 2.5 WSS Facilities at Public Institutions

            =             &nb= sp;            =         2.5.1 and 2.5.2 National/Provincial Approach to Public Facilities

      Activity 2.6 IEC Monitoring and Evaluation System

            =             &nb= sp;            =         2.6.1 Develop a Framework for KAP S= tudies

Output 3:     Finance Component

      Activity 3.1 Establish the Legal Basis and Procedures

            =             &nb= sp;            =         3.1.1 Review the Strengths and Weak= nesses of Existing Schemes

            =             &nb= sp;            =         3.1.2 Establish Policy and Regulatr= oy Base for Funds

            =             &nb= sp;            =         3.1.3 Develop Lending/Grant Allocat= ion Criteria & On-Lending Policies

            =             &nb= sp;            =         3.1.4 Lending and Disbursement Proc= edures

            =             &nb= sp;            =         3.1.5 Tariff System for Piped Water Schemes

      Activity 3.2 Set-Up Funds

            =             &nb= sp;            =         3.2.1 and 3.2.2 National and Provin= cial RWSS Funds

      Activity 3.3 Develop Monitoring Procedures and Mechanisms

Output 4:     Technical Component

      Activity 4.1 Water Quality Control

            =             &nb= sp;            =         4.1.1 Definition of Fresh Excreta

            =             &nb= sp;            =         4.1.2 Sanitation in Flood Prone Are= as

            =             &nb= sp;            =         4.1.3 Guidelines for Soakaway Latri= nes

            =             &nb= sp;            =         4.1.4 Water Quality Testing

      Activity 4.2 Technology Standardisation and Quality Assurance

            =             &nb= sp;            =         4.2.1 General Manuals and Guideline= s

            =             &nb= sp;            =         4.2.2 Water Resource Manuals and Guidelines

            =             &nb= sp;            =         4.2.3 Water Supply Manuals and Guid= elines

            =             &nb= sp;            =         4.2.4 Sanitation Manuals and Guidel= ines

      Activity 4.3 Improved Construction Management Systems

            =             &nb= sp;            =         4.3.1   Contract Management for RWSS schemes

            =             &nb= sp;            =         4.3.2   Construction Supervision

            =             &nb= sp;            =         4.3.3   Private Sector Participation

     

3&nb= sp;            =           Objectives and Approach

3.1&= nbsp;           &nbs= p;  Objectives

The development objective of the = WAterSPS is:

Imp= roved living conditions for the people of Vietnam by better access to water relat= ed services, particularly for the poor or otherwise disadvantaged groups of society

The development objective for the national capacity building component is the immediate objective 1 of the WAterSPS which is:

An enabling legislative and institutional framework for sustainable use of wat= er resources and water service delivery with capable staff for its administrat= ion and enforcement at central and provincial levels

The development objectives remain unchanged.

The immediate objective of the su= pport to the implementation of the Strategy under sub-component 1.2 of the national capacity building component is:

Assist in the establishment of capability of CERWASS to implement the NRWSS Strategy in a cost-effective manner and in accordance with the overal= l political and institutional framework and the lessons learned in a number of pilot schemes in selected communes, districts and provinces

The immediate objective remains unchanged, however it is recommended that this is enhanced and simplified by rewording it as follows:

A strengthened CERWASS able to coordinate the implementation of the Strategy<= /span>

The rewording of the immediate ob= jective of the sub-component is made to:

3.2&= nbsp;           &nbs= p;  Approach

3.2.1             General

The Strategy= is based upon a number of general underlying principles which have to be tested and applied in an appropriate version in specific locations in various districts and provinces in Vietnam. This will require a high degree of institutional learning capacity in CERWASS as the organisation responsible = for the coordination for the nationwide implementation of the Strategy. The activities supported by the sub-component are designed to enhance the development of this capacity in CERWASS. A learning-by-doing approach will = be adopted with a dual motive:

4&nb= sp;            =           Outputs and Activities

The WAterSPS= will assist CERWASS generate the institutional framework and the organisation capabilities needed for it to coordinate the implementation of the Strategy. Concepts and elements in a demand responsive approach to RWSS will be teste= d in a Vietnamese context to form the basis for a RWSS plan for 2006-2010 design= ed to meet the targets set in the Strategy for 2010.

The original “outputs” of the sub-component and their current status are:


No

OUTPUT

Status

<= span style=3D'mso-list:Ignore'>1 

NRWSS Office Est= ablished in CERWASS

Will be completed by the end of 2001

<= span style=3D'mso-list:Ignore'>2 

Improved awarene= ss and acceptance of NRWSS at all relevant levels

Will be largely completed in 2002

3

Improved awarene= ss for user groups/user organisations

On-going in 2002/2003 within the framework of phase I of the Strat= egy action plan under the IEC component

4

National fund fo= r RWSS established on pilot basis

Provinci= al RWSS funds to be established by end 2001 and operational by mid-2002

5

Study of institu= tional development (ID), organization development (OD) and HRD requirements

Will be completed once it is possible to continue in a participato= ry manner that will ensure the ownership of the recommendations

6

HRD programme implemented

Will be developed continuously in response to the needs arising du= ring the period 2002-2005

7

ID/OD plan and p= rogramme

Will be developed in 2002/2003 within the framework of phase I of = the Strategy action plan under the capacity building component

8

New concepts and procedures - develop= ed and incorporated in design of pilot projects

Framework for demand responsive projects, based on “Output” 9 ready by mid-2002

9

Lessons learnt f= rom first generation of pilot projects in few communes documented in evaluati= on report

Evaluation report based on “Pioneer Strategy projects” implemented during 2000-2001 ready by end Q1 2002

10

Design of second generation of pilot projects

On-going in 2002/2003 within the framework of phase I of the Strat= egy action plan

11

Documentation of= lessons learnt from second generation of pilot projects

On-going in 2002/2003 within the framework of phase I of the Strat= egy action plan

12

Plan for nationwide replication with adjustments for lessons learnt

On-going in 2004/2005 within the framework of phase II of the Stra= tegy action plan

Note: The narrative of the origin= al “outputs” is enhanced in Figure 4.1

All of the “outputs” in the sub-component description remain valid activit= ies for the WAterSPS and will be developed within the framework of the Strategy action plan.

From early 2002, WAterSPS activit= ies will be described within the context of the Strategy action plan (section 3.2). Progress reports 1 (January to June 2001) and 2 (annual report 2001) will, however, use the enhanced “outputs” in Figure 4.1 for their reporting frame.

4.1&= nbsp;           &nbs= p;  Scop= e of Work

The scope of= work for the sub-component is defined by its “outputs”.

4.1.1             Outp= ut 1 NRWSS Office Established in CERWASS

A Strategy coordination office has been established in CERWASS with the appointment of= a senior member of CERWASS who is supported by a Danida STA and support staff (accountant, secretary cum translator and drivers).

[To avoid se= tting up a parallel organisation, the Strategy coordination office will remain small with a time bound mandate to coordinate the implementation of the Strategy action plan. To support the implementation of the Strategy, CERWASS will establish new units under existing sections covering: HRD; IEC, monitoring = and evaluation; CERWASS website; RWSS financing; and technology research and development, (Appendix 4). The new units will be managed by trainable and retainable CERWASS staff with support from long and short term national and international specialists to be provided by donors. This is part of the CER= WASS organisational strengthening plan (Output 7)]

4.1.2             Outp= ut 2 Improved Awareness and Acceptance of NRWSS at all Relevant Levels.

The acceptan= ce of the underlying principles of the Strategy of sustainable development, demand responsive approach, socialization of RWSS and the important role of IEC is generally well disseminated at the national level (among key ministries and= the mass organizations) and to some extent at the provincial level, as demonstr= ated by the design of projects submitted to the NTP in September 2001.

The implicat= ions of implementing a demand responsive approach and the socialization of RWSS programmes may, however, be less understood. There is a need therefore for CERWASS to sensitise authorities at the national and provincial level. This will achieved through participatory Strategy workshops. A Strategy handbook= and other materials are also being developed.

Upon request, CERWASS will assist provinces to develop their own package to promote the <= /span>awareness and acceptance of the Strategy to lower levels. [It = is extremely important that in promoting awareness at lower levels, the promot= er is able to meet the demand t= hat such activities may occasion].

4.1.3             Outp= ut 3: Improved Awareness for User Groups/User Organisations

There is a n= eed to improve the awareness of target communities on, inter alia: the principles of the Strategy, the updated roles a= nd responsibilities of key stakeholders; the availability of loans and grants, project implementation arrangements and owner operation and management, so = that people can initiate discussion amongst themselves.

Use of the m= ass media needs to be targeted to ensure very close coordination with access to appropriate financing that can meet the demands raised. The strategy must be cost effective.

Unicef have developed guidelines on social marketing strategies. CERWASS are engaging prominent journalists to enlist their support in raising awareness of the Strategy in the mass media. The profile of national events such as the WSS = week and environment day will be increased to raise awareness of the general principles in the Strategy. The Vietnam Bank of Agriculture and Rural Development (VBA) has expressed a strong interest to promote financing of R= WSS as part of their own market penetration strategy.

4.1.4             Outp= ut 4: National Fund for RWSS Established on Pilot Basis

A team compr= ising of a CERWASS professional staff member, international and national specialists= and representatives from the VBA have developed a model for a provincial financ= ing mechanism for RWSS including credit and the equitable distribution of grant= s.

The institutionalization of a national fund for RWSS may be on-going for a numb= er of years. This work will continue within the framework of phases I and II of the Strategy action plan under the finance component

4.1.5             Outp= ut 5: Study of Institutional Development and Organisational and HRD Requirements<= /span>

The study wi= ll take its point of departure in the roles and responsibilities of the various stakeholders as suggested in the Strategy. It will assess the present roles= and capabilities with regard to the future roles and identify the necessary cha= nges in the institutional set-up, the need for organisational development within= the existing organisations and the related need for HRD.

Draft terms = of reference for the study have been prepared and a preliminary input has been made, however it will only be possible to finalise the study, using a participatory approach, with departments in other ministries once CERWASS is nominated to coordinate the implementation of the Strategy

Within CERWA= SS, the creation of new units, as described under “output” 1, has been = endorsed by the CERWASS management board. A TNA is planned and the development of a quality management plan is on-going.

4.1.6             Outp= ut 6: HRD Programme Implemented

A HRD progra= mme for CERWASS, based on the TNA under Output 5, will be designed and implemented = by a local training provider with the support of a short term international HRD specialist. The programme will be derived from an analysis of the most cost-effective way to achieve the HRD targets within the time perspective a= nd overall objective of the sub-component.&nb= sp; Emphasis will be given to tailor made programmes for in service trai= ning and short term courses in Vietnam and in the region.

English less= ons and courses offered by the British Council and the Asian Institute of Technology centre in Vietnam are being offered by the WAterSPS to all CERWASS staff as part of a personal development scheme.

4.1.7             Outp= ut 7: Institutional and Organisational Development Plan and Programme<= span style=3D'mso-ansi-language:EN-US'>

Output 5 will identify the need for change in the institutional roles and responsibilities within the RWSS sector as well as the need for assistance to initiate the processes. The WAterSPS will place emphasis on achieving the required institutional and organisational developments in MARD and CERWASS. The provinces and districts supported by component 2 of the WAterSPS will imple= ment parallel changes.

The lessons = learnt will provide the basis for a nationwide institutional development process in preparation for the full scale implementation of the Strategy during the pe= riod 2006-2010.

4.1.8             Outputs 8 and 10: “= New Concepts and Procedures (Developed and Incorporated in Design of Pilot Projects)” and “Design of Second Generation of Pilot Projects”<= /o:p>

These two “outputs” describe phases of the WAterSPS (as discussed under section 2.2) as distinct from outputs in terms of results or deliverables. = The sub-component activities to be developed within the framework of the Strate= gy action plan will contribute to (possibly) four outputs covering: capacity building; IEC; finance and technical solutions (Box 2.2).

The two R= 20;outputs” roughly correspond to phase I of the Strategy action plan (Figure 3.1). Dur= ing this period, CERWASS will work in close collaboration with selected pilot provinces to develop new concepts, procedures and guidelines. Some of these= may be initiated at central level, while others will be firmly based in practic= al experience from the field. Good coordination to avoid duplication is the ke= y to the cost effective operationalisation of the Strategy.

Provincial authorities, as well as national and international specialists working at provincial level, need to support CERWASS to develop tested concepts and procedures into guidelines or as examples of best practice that can be post= ed on the CERWASS website. Likewise, CERWASS need to post information promptly= on the website regarding activities developed at the central level so that the= se can be taken up and/or developed in the field.

“Outpu= t” 8 in the enhanced logical framework is taken to be a “framework for demand responsive approaches” that will be developed, and agreed on, = by the pilot provinces collaborating with CERWASS to implement the Strategy ac= tion plan.

“Output” 10 refers to= the updated 5 year framework discussed under 9.1

4.1.9             Outp= uts 9 and 11: “Lessons Learnt from First Generation of Pilot Projects” and “Documentation of Lessons Learnt from Second Generation of Pilot Projects”

Both of these “outputs” are evaluation reports of phases of the WAterSPS. “Output” 9 was to be generated from the first generation of pil= ot projects in a few selected communes under component 2 of the WAterSPS and “output” 11 was to be prepared in mid-2005 after three years of testing in the field.

The take up = of the Strategy in some provinces has, however, proceeded quicker than anticipated= in the design of the sub-component. As a result, there are a number of schemes incorporating some of the principles of the Strategy, including the project= s in Thua Thien Hue and Quang Binh provinces that have been funded by Danida, through Unicef, specifically to test the Strategy.

It is propos= ed to carry out an evaluation of such “Strategy pioneer projects” in early 2002. The evaluation report would roughly correspond to “output” 9. The evaluation would serve to identify strengths and weaknesses in the interpretation of the Strategy and to guide the prioritisation of the planning of activities that will support the operationalisation of the Strategy.

In addition = to evaluating “project issues” (e.g. the approval procedures; the = role of IEC, the form of “participation”, the selection of technolog= y, the financing mechanism, the O&M arrangements, the calculation of tarif= fs, the role of the private sector etc.), the exercise will also identify opportunities to integrate cross cutting themes, such as governance, gender, equity and democratisation, into the overall development agenda of RWSS interventions.

By adopting a participatory approach, the evaluation will also provide an opportunity for provinces to identify how they could become more effective and/or efficient= in expanding sustainable service coverage and to identify gaps in the tools and instruments that they presently posses for this purpose.<= /p>

In some inst= ances, provinces already have developed “Strategy models” e.g. “water service entities” in Tien Giang province. The WAterSPS w= ill facilitate the regularisation and dissemination of such initiatives at the national level.

“Outpu= t” 11 will be on-going throughout the WAterSPS with regular sharing of news, information, experiences and ideas on the CERWASS website.

4.1.10“Outpu= t” 12 will therefore need to be ready by mid-2003 for implementation in 2004-2= 005 as phase II of the Strategy action plan.

4.2&= nbsp;           &nbs= p;  Enha= nced Narrative Description for Sub-Component 1.2

Based on the= above, it is possible to enhance the narrative description in the sub-component logical framework as indicated in Figure 4.1 below.


Figur= e 4.1: Enhanced “Narrative Description” for WAterSPS Sub-Component 1.2=

Original Narrative Description=

Enhanced Narrative Description

Notes

Immediate Objective:

Assist in the establishment of capability= of CERWASS to implement the NRWSSS in a cost effective manner and in accorda= nce with the overall political/institutional framework and the lessons learne= d in a number of pilot schemes in selected communes, districts and provinces

Immediate Objective

A strengthened CERWASS able to coordinate= the implementation of the Strategy

 

 

Rationale provided in Section 2.1

 

CERWASS will collaborate with 15 provinces within the ambit of the Strategy action plan.

 

WAterSPS “Output” 1

RWSSS office established in CERWASS<= /o:p>

WAterSPS “Output” 1

Strategy coordination office established = in CERWASS

 

In addition six new units will be establi= shed in CERWASS to develop new thematic areas

WAterSPS “Output” 2

Awareness and acceptance of NRWSSS at all relevant levels in GOV and Mass Organisations at HQ, Province, District a= nd Commune Level

WAterSPS “Output” 2

Awareness and acceptance of Strategy at a= ll relevant levels

 

 

CERWASS will assist provinces to develop packages to be used to communicate the principles of the Strategy to lower levels.

WAterSPS “Output” 3

Awareness of NRWSSS procedures and roles = and responsibilities of user organizations

WAterSPS “Output” 3

Raised awareness of Strategy procedures a= nd the roles and responsibilities of water user organizations at provincial level

 

CERWASS will assist provinces to develop packages to be used to facilitate the formation of water user groups=

WAterSPS “Output” 4

National Fund for Rural Water Supply and = Sanitation established on pilot basis

WAterSPS “Output” 4

National Fund for RWSS, established on pi= lot basis in selected provinces

 

To support national debate, pilot provinc= ial RWSS funds will be set-up to demonstrate financing principles<= /span>

WAterSPS “Output” 5

Study of Institutional Development and Organisational and HRD requirements

WAterSPS “Output” 5

Institutional Development, Organisation Strengthening and HRD plans completed

 

Initial focus on CERWASS, MARD and other national level institutions.

WAterSPS “Output” 6

HRD Programme

WAterSPS “Output” 6

HRD programme implemented

 

Includes work environment

WAterSPS “Output” 7

Institutional and Organizational Development P= lan and Programme

WAterSPS “Output” 7

Institutional Development and Organisation Str= engthening plan implemented

 

Initial focus on CERWASS and MARD

WAterSPS “Output” 8

New Concepts, Guidelines and Procedures developed and incorporated in design of Pilot Projects<= /p>

WAterSPS “Output” 8

New concepts, guidelines and procedures developed and incorporated in design of RWSS projects

 

Framework for demand responsive projects, based on lessons learnt from “pioneer Strategy projects” (“Output” 9)

WAterSPS “Output” 9

Lessons learnt from first generation of P= ilot Projects in few communes documented in evaluation report

WAterSPS “Output” 9

Lessons learnt from the “pioneer Strategy projects” in few communes documented.

 

“Pioneer Strategy projects” implemented during 2000-2001

WAterSPS “Output” 10

Second generation of Pilot Projects in 3-4 Districts in Dak Lak and Ha Tinh

WAterSPS “Output” 10

Strategy action plan pilot provinces incorporate Strategy principles in the design of their RWSS projects=

 

Corresponds to phase I of the Strategy ac= tion plan

WAterSPS “Output” 11

Lessons learnt from second  generation of Pilot documented in evaluation report

WAterSPS “Output” 11

Lessons learnt from Strategy action plan pilot provinces documented at national level

 

On-going process during phase I of the Strategy action plan

WAterSPS “Output” 12

Plan for Nationwide replication with adjustmen= ts for lessons learnt

WAterSPS “Output” 12

Phase II of the Strategy action plan proc= eeds by start of 2004

 

Corresponds to phase II of the Strategy action plan

 

5&nb= sp;            =           Inputs

5.1&= nbsp;           &nbs= p;  Danida

Danida provi= des a Senior Technical Adviser (STA) to CERWASS. The position is financed from Da= nida funds outside the sub-component budget. The STA arrived in Hanoi on December 18, 2000. The updated job description for this position is presented in Appendix 5.

In order to undertake the activities to deliver the “outputs” outlined in Section 4 the WAterSPS provides an international technical assistance team contracted by Danida and funds for:

5.1.1             Inte= rnational Consultants

International technical assistance is considered valuable by MARD because the concepts be= hind the Strategy are new to Vietnam and as a result very few GoV staff or local consultants have experience in implementing them.

International consultants bring international experience and exposure. They also bring a higher degree of specialist knowledge. Also, it is expected that internatio= nal expertise will be able to provide extensive on the job coaching and mentori= ng through a team working approach.

Carl Bro a/s. provide the international technical assistance to sub-component 1.2 and component 2. The team leader, who will be based in Hanoi, will spend approximately 1/3 of her time in CERWASS in relation to sub-component 1.2. = The team leader’s draft job description is included as Appendix 6.

The internat= ional technical assistance to be provided to CERWASS originally totaled just 35 m= an months, or about 20% of the total 177 man months (mm) to be provided by Carl Bro a/s. The scope of work reflected the desire to support the process of capacity building in CERWASS and envisaged inputs from: an economist (3 mm)= ; an institutional specialist (11 mm); cross cutting specialists (12 mm) and unspecified (9 mm). This left gaps at the national level, particularly in t= he support to IEC and technology development, however this has been rectified = by the combined technical assistance contract.

Carl Bro inv= oicing will be divided 20:80 between sub-component 1.2 and component 2. This is ba= sed on the inputs in the component descriptions.

The internat= ional technical assistance will need to be demand responsive.

5.1.2             Oper= ational Costs<= /h3>

The total bu= dget available is DKK 1.9 million. This is far in excess of current estimates and has been reduced to DKK 650,000 over 5 years.

5.1.3             Nati= onal Technical Assistance

Danida will = provide DKK 800,000 to contract 40 mm of national technical assistance over 5 years. Since the fee rate for national consultants in the budget is about 50% more than the maximum rate allowed under the EU guidelines, it will be possible = to contract 60 mm or more. Travel and transport costs for the national specialists, included in the original fee rate, will be charged to the trav= el and transport budget head (section 5.1.5).

The national technical assistance will be hired, from the private sector, in response to knowledge gaps in CERWASS.

5.1.4             Nati= onal Staff<= /h3>

With the int= roduction of the “EU guidelines for financing of local costs in development cooperation with Vietnam”, the payment of salary allowances to GoV st= aff is no longer permitted. The Royal Danish Embassy has however determined that each sub-component may pay one strategic allowance and this is currently sh= ared by the sub-component director and manager.

Notwithstand= ing the withdrawal of suggested salary allowances, the estimated budget for this he= ad will be approximately doubled to DKK 1.37 million. This is due to the need = to hire an accountant, a secretary cum translator, drivers, IEC assistants to strengthen the CERWASS IEC unit and a part time administrator to support the implementation of the CERWASS quality management plan.

5.1.5             Trav= el and Transport

The budget f= or this head remains unaltered and is sufficient to also include costs associated w= ith the contracted short term national TA.

5.1.6             Offi= ce Equipment and Cars<= /o:p>

The budget i= s being used to equip additional office space (made available by CERWASS as part of= the contribution from the GoV) and to improve the working environment in the new units being established (within existing CERWASS office space) to coordinate the implementation of the Strategy. To the extent possible, CERWASS are reallocating their own office equipment and resources to maximize the productivity of the same.

Two vehicles= were delivered to CERWASS in early February 2001 and registered under GoV number plates in September 2001. Due to lower than expected vehicle costs, the bud= get is reduced by DKK 200,000.

5.1.7             CERW= ASS HRD

The budget is increased by about 50%. The additional funding is needed as a direct result= of creating seven new units in CERWASS and the subsequent need for existing CERWASS staff to learn new skills.

5.1.8             Info= rmation

The budget r= emains unaltered but the focus shifts somewhat from mass media communication to information exchange and sharing e.g. CERWASS website.

5.1.9             Work= shops and Conferences

The budget is increased from DKK 160,000 over 5 years to DKK 575,000 over the same period. Unit costs to hold external events are considerably above those estimated in the original budget.

5.2&= nbsp;           &nbs= p;  Government of Vietnam

The operationalisation of the Strategy requires extensive inputs from GoV, since donor inputs can provide only limited support to GoV led initiatives. As th= e work is a core duty of the GoV and involves the part time input of many staff fr= om across different disciplines and ministries, it is difficult to define and quantify the exact inputs to be provided. Ultimately the only practical approach is to make the working assumption that the GoV will provide all in= puts that are necessary, over and above those inputs provided by Danida and other donors. If this does not happen then it signals a change in priorities and = the level of ambition and the nature of the WAterSPS will need to be reassessed= .

It is expect= ed that MARD and CERWASS will provide:

6&nb= sp;            =           Assumptions

These are fa= ctors which serve as useful information to the sub-component management team. Assumptions are monitored in order to ensure that activities to be undertak= en by others are carried out. Moreover, the sub-component management team need= s to manage risks and address the identified limiting factors in order to undert= ake realistic planning.

The assumpti= on in the sub-component description for outputs to contribute to the immediate purpose of the WAterSPS is that “lessons learnt in pilot projects con= firm the soundness of the basic principles of the Strategy”. Observations = from the field, to date, would support the soundness of this assumption.

The assumpti= ons in the sub-component description for the activities to generate outputs are:

7&nb= sp;            =           Indicators and Means of Verification

To be useful, verifiable indicato= rs must be defined in terms of quantity, quality and time. The indicators for the “outputs” in the logical framework for sub-component 1.2 are not described in terms of levels of achievement and therefore could not be used= to define an evaluation plan for the sub-component.

Figure 7.1 lists the original nar= rative description and the original indicators against suggested updated verifiable indicators described in terms of QQT.

Figure 7.2 lists the enhanced nar= rative framework (from Figure 4.1), the updated verifiable indicators (from figure 7.1) and updated means of verification. Figure 7.2 is in fact the updated logical framework for sub-component 1.2.

The updated logical framework is = still far from perfect, however at this stage, it is not considered useful to att= empt to improve it further, since it is anticipated that in the near future, WAterSPS activities will be identified within the logical framework for the Strategy action plan. WAterSPS activities will contribute to the achievemen= t of national outputs for which verifiable indicators and means of verification = will be developed.

Nevertheless, the updated verifia= ble indicators do provide a reasonable idea of the focus, at least initially, of the support from the sub-component.

The updated EOPI for sub-componen= t 1.2 is the anticipated EOPI for the Strategy action plan. Although the WAterSPS al= one will not provide all the inputs needed to generate the outputs necessary to achieve the immediate objective of the Strategy action plan, nevertheless t= he WAterSPS should only proceed in an environment where other external necessa= ry and sufficient conditions are in place. To do otherwise, the WAterSPS could= be effective but have little impact e.g. a strengthened CERWASS but no action = plan to coordinate.

The updated means of verification= remain largely dependent on reports and documents however more of these are outside the direct control of the WAterSPS. The “awareness raising outputs= 221; (“outputs” 2 and 3) are tied to independent sources of data that will be able to measure the effectiveness of the planned awareness raising activities. “Output” 4 will use VBA records and “Outputs&= #8221; 10 and 11 rely on the CERWASS website.


Figure 7.1: Updated Indicators for WAterSPS Sub-Component 1.2 “Outputs”

Original Narrative Description

[From Sub-Component Description]

Original Verifiable Indicators

[From Sub-Component Description]

Updated Verifiable Indicators

Original Immediate Objective:

Assist in the establishment of capability= of CERWASS to implement the NRWSSS ……..

 

 

Reworded Immediate Objective

A strengthened CERWASS able to coordinate= the implementation of the Strategy

 

       A National Programme 2005-2010 in accordance with NRWSSS approved= by 2004

       A National Fund for RWSS used by GoV and donors to channel funds = for RWSS investments undertaken by user organisations

       Competent staff at all levels capable to fulfill their new roles = and responsibilities

National RWSS programme for 2006-2010, ba= sed on Strategy principles, approved in 2005

 

WAterSPS “Output” 1

RWSSS office established in CERWASS<= /o:p>

 

Inspection/progress report

 

Inception report, work plans for 2002 and consultant’s QA plan approved by NSC in Jan 2002<= /p>

WAterSPS “Output” 2

Awareness and acceptance of NRWSSS at all relevant levels in GOV and Mass Organisations at HQ, Province, District a= nd Commune Level

 

Satisfactory reports from workshops, semi= nars and other awareness raising activities

 

Strategy action plan pilot provinces̵= 7; RWSS plans include Strategy principles by Oct 2002

WAterSPS “Output” 3

Awareness of NRWSSS procedures and roles = and responsibilities of user organizations

 

Applications from User Organisations

 

Strategy action plan pilot provinces supp= ort the formation of water user groups from mid-2002 onwards

WAterSPS “Output” 4

National Fund for Rural Water Supply and Sanitation established on pilot basis

 

Fund Organisation, management, regulation= and procedures in place and approved by GOV

 

Some Strategy action plan pilot provinces have functioning loan guarantee funds by mid-2002

WAterSPS “Output” 5

Study of Institutional Development and Organisational and HRD requirements

 

Recommendations of Study approved by SPS Steering Committee

 

ID/OS and HRD plans approved by CERWASS management by early 2002

WAterSPS “Output” 6

HRD Programme

 

HRD Programme approved by SPS Steering Committee

 

New units in CERWASS able to implement planned activities

WAterSPS “Output” 7

Institutional and Organizational Development P= lan and Programme

 

Institutional and organisational  plan and programme approved by S= PS Steering Committee

 

Quality management plan being implemented= by CERWASS from early to mid-2002

WAterSPS “Output” 8

New Concepts, Guidelines  and Procedures developed and incorporated in design of Pilot Projects

 

Design of Pilot Schemes approved by SPS Steering Committee

 

Strategy action plan pilot provinces agre= e on a framework for demand responsive projects by mid-2002<= /p>

WAterSPS “Output” 9

Lessons learnt from first generation of P= ilot Projects in few communes documented in evaluation report

 

Evaluation of Lessons learnt in SPS Revie= w

 

Evaluation report on “Strategy pion= eer projects” in selected provinces by early 2002

WAterSPS “Output” 10

Second generation of Pilot Projects in 3-4 Districts in Dak Lak and Ha Tinh

 

Scheme Progress Reporting

 

Guidelines published and best practice documented on an on-going basis from mid-2002

WAterSPS “Output” 11

Lessons learnt from second  generation of Pilot documented in evaluation report

 

Evaluation of Lessons learnt in SPS Revie= w

 

CERWASS website updated regularly by Feb = 2002

WAterSPS “Output” 12

Plan for Nationwide replication with adjustmen= ts for lessons learnt

 

National seminars disseminates and discus= ses draft plan with widely acceptable guidelines and procedures for Nation Wi= de implementation of the NRWSSS

 

Phase II of the Strategy action plan proc= eeds by start of 2004


Figur= e 7.2: Updated Means of Verification for WAterSPS Sub-Component 1.2

Enhanced

Narrative Description

[From Figure 4.1]

Updated

Verifiable Indicators

[From Figure 7.1]

Updated

Means of Verification

Immediate Objective:

A strengthened CERWASS able to coordinate= the implementation of the Strategy

 

National RWSS programme for 2006-2010, ba= sed on Strategy principles, approved in 2005

 

Decisions of MPI and MoF and minutes of t= he steering board of the national fund for RWSS

WAterSPS “Output” 1

Strategy coordination office established = in CERWASS

 

Inception report, work plans for 2002 and consultant’s QA plan approved by NSC in Jan 2002<= /p>

 

Minutes of NSC

 

WAterSPS “Output” 2

Awareness and acceptance of Strategy at a= ll relevant levels

 

Strategy action plan pilot provinces̵= 7; RWSS plans include Strategy principles by Oct 2002

 

Comparison and analysis of proposals subm= itted to NTP by all provinces in Oct 2002

WAterSPS “Output” 3

Raised awareness of Strategy procedures a= nd the roles and responsibilities of water user organizations at provincial level

 

Strategy action plan pilot provinces supp= ort the formation of water user groups from mid-2002 onwards

 

Provincial records of water user groups registered

WAterSPS “Output” 4

National fund for RWSS, established on pi= lot basis in selected provinces

 

Some Strategy action plan pilot provinces have functioning loan guarantee funds by mid-2002

 

VBA records at provincial level

WAterSPS “Output” 5

Institutional Development, Organisation Strengthening and HRD plans completed

 

ID/OS and HRD plans approved by CERWASS management by early 2002

 

Published document

WAterSPS “Output” 6

HRD programme implemented

 

New units in CERWASS able to implement planned activities

 

Progress reports

WAterSPS “Output” 7

Institutional Development and Organisation Strengthening plan implemented

 

Quality management plan being implemented= by CERWASS from early to mid-2002

 

Progress reports

WAterSPS “Output” 8

New concepts, guidelines and procedures developed and incorporated in design of RWSS projects

 

Strategy action plan pilot provinces agre= e on a framework for demand responsive projects by mid-2002<= /p>

 

Published document

WAterSPS “Output” 9

Lessons learnt from the “pioneer Strategy projects” in few communes documented.

 

Evaluation report on “Strategy pion= eer projects” in selected provinces by early 2002

 

Published document

WAterSPS “Output” 10

Strategy action plan pilot provinces incorporate Strategy principles in the design of their RWSS projects=

 

Guidelines published and best practice documented on an on-going basis from mid-2002

 

CERWASS website

WAterSPS “Output” 11

Lessons learnt from Strategy action plan pilot provinces documented at national level

 

Best practices toolkits on CERWASS website updated regularly from Feb 2002

 

Number of “hits” on CERWASS website

WAterSPS “Output” 12

Plan for nationwide replication of the Strateg= y

 

Phase II of the Strategy action plan proc= eeds by start of 2004

 

Minutes of inter-ministerial Strategy steering committee

 <= /span>

8&nb= sp;            =           Organisation

WAterSPS management comprises of a = National Steering Committee (NSC) and Provincial Steering Committees (PSC). The NSC = has the overall responsibility for the implementation of the WaterSPS. The NSC = is supported by a Central Program Management Unit (CPMU) located within MARD’s International Cooperation Department (ICD). The implementation= of the WAterSPS is co-ordinated by the CPMU. The functions of NSC and CPMU are described further in Appendix 7

At component and sub-component le= vel the formal organisation may be supplemented by informal coordination groups or = task forces that will facilitate day-to-day implementation. Sub-component 1.2, t= ogether with the three sub-components in component 2 (RWSS), is a member of the RWSS coordination committee (RWSSCC).

The WAterSPS manual (in the final= stages of preparation) has been prepared with the objective of providing all institutions and staff involved in the management and implementation of the WAterSPS with information on the scope, organisation and procedures governi= ng the WAterSPS. The following information has been summarised from the WAterS= PS manual.

8.1&= nbsp;           &nbs= p;  Strategy Coordination Off= ice

The “project implementation unit” for sub-component 1.2 has been established within CERWASS as the Strategy coordination office. The office is headed by the CERWASS director = who is also the sub-component director. The Strategy coordination office report= s to MARD’s ICD and to the RDE via the CPMU.

The Strategy coordination office = is required to meet the objectives of the sub-component through the timely implementation of activities with the allocated resources and within budget. The Strategy coordination office is required to:

8.2      =          Informal Coordination and Working Groups

Informal groups are required to strengthen coordination of WAterSPS activities. The need for such groups is particularly great in RWSS service delivery, which traditionally is fragmen= ted between several sectors.

In Vietnam this type of coordinat= ion is typically achieved through joint participation in official Government bodie= s, such as the national water resources council, the national committee for sa= fe water and environmental health, and programme/project steering committees.<= /span>

In the WAterSPS it is proposed to= achieve this cooperation partly through the provincial steering committees and part= ly through ad-hoc coordination groups, working groups or task forces.

8.2.1             RWSS Coordination Committ= ee

The RWSS Coordination Committee (= RWSSCC) is to co-ordinate national and provincial level activities to ensure a unif= orm implementation of the Strategy

The functions to be performed wit= hin the group are inter alia:

8.2.2             Working Groups and Task F= orces

Working groups and task forces ma= y be established by individual sub-components to enlist the support of other sec= tors to be involved in activities supported by the sub-component.

The formation of such groups and = task forces at the national level has however to date been severely hampered due= to:

9&nb= sp;            =           Sub-Component Implementat= ion Plan

9.1&= nbsp;           &nbs= p;  5-Year Plan

WAterSPS support to CERWASS under sub-component 1.2 will be provided within the framework of the Strategy act= ion plan described in the Strategy document approved by the prime minister under decision 104 in August 2000.

A comprehensive list of tasks tha= t are likely to be included in the action plan is described in volume 3 of the Strategy study prepared in March 1999. This list of tasks will need to be updated by CERWASS in close consultation with other participating ministries once it has received a mandate from MARD to do so. The updated list of tasks can then be developed into the logical framework for the Strategy action pl= an.

Once the logical framework for the Strategy action plan is finalised, it will be possible for CERWASS to ident= ify the activities/tasks that it would like the sub-component to support and develop during the first two years of phase I. Other donors have expressed a strong interest in contributing to the development of some tasks during the same period. Some donors will support activities in other ministries and the use of a common logical framework will greatly facilitate inter-ministerial= and donor coordination by CERWASS.

In phase II (years 3 and 4) activ= ities at national level will consist of refining and developing various manuals and guidelines in the light of the experience from the pilot provinces in years= 1 and 2. CERWASS will also be responsible for coordinating the replication of= the Strategy to the remaining provinces.

Support, in both phases of the ac= tion plan, needs to remain flexible and responsive to the needs of CERWASS in the pursuit of its role as the coordinator of the implementation of the Strategy action plan.

For the purpose of illustration, a tentative hierarchy of objectives for the Strategy action plan for the peri= od 2002-2005 has been prepared based on the outline of key tasks described in volume 3 of the Strategy study (Box 2.2). This illustrates the size of the = job facing the RWSS sector in moving away from a supply driven approach monopol= ised by the state, to a dynamic and enabling participatory demand responsive approach embracing substantive contributions from many areas of civil socie= ty.

Many of the tasks in the hierarch= y of objectives have significant sub tasks. Indeed some of these could in themse= lves become future WAterSPS sub-components e.g. Task 4.1.4 National Water Quality Testing or Task 1.2.3 Implementation of a Comprehensive HRD Plan for the RW= SS sector.

In addition to providing general = capacity building support to CERWASS, it is expected that the WAterSPS, through sub-= component 1.2, will take a leading role at the national level in IEC and the institutionalisation of a national fund for RWSS financing. In collaboration with sub-component 1.1 (implementation of the law on water resources), the WAterSPS should also make a significant contribution to establishing the necessary legal and regulatory framework.

9.2&= nbsp;           &nbs= p;  Plan for 2001<= /h2>

In early July 2001 the director C= ERWASS and the STA, with support from the sub-component manager and in consultation with other CERWASS managers, prepared a tentative list of activities to be developed in the second half of 2001 with support from sub-component 1.2. T= he rationale behind these activities was to establish a good basis for develop= ing the Strategy action plan from January 1, 2002 onwards.

The outputs/activities were purpo= sely not put into a formal time schedule given the prevailing considerable uncertain= ties that made any time bound planning extremely difficult, if not impossible. T= he aim is to complete all the activities and to respond to new opportunities as and when they arise. The list of activities is included as Appendix 9. Prog= ress on these activities will be included in the annual progress report to be re= ady by mid-December 2001.

Sub-component 1.2 is supporting t= he development of new ideas and concepts and a step by step flexible approach = with a certain degree of innovation needs to be adopted in order to achieve the = key milestones as set out in the Strategy action plan. Rigid planning would be counterproductive in such situations.

Finally it is important to recogn= ise that CERWASS is coordinating many and varied on-going activities in the RWSS sec= tor. The operationalisation of the Strategy is acknowledged as a priority by CER= WASS and all of the staff is very keen to contribute, but it will not be possibl= e to focus only on this issue.

9.3&= nbsp;           &nbs= p;  Plan for 2002<= /h2>

Detailed time bound work plans and budgets for sub-component 1.2 for 2002 are currently being prepared by the = new thematic units established in CERWASS, with inputs from the international a= nd national consultants. The WAterSPS will assist CERWASS to develop activitie= s in capacity building, IEC, financing as well as technical areas. The plans and budgets will be ready by mid-November 2001. Many of these activities will h= ave a two year outlook: corresponding to phase I of the Strategy action plan.

Some divergence from these time b= ound plans can be expected as the sub-component needs to continue to be responsi= ve to ideas coming from the provinces. Other unforeseen demands on CERWASS, bu= t of a higher priority, may also cause some unavoidable changes/delays to the pl= ans.

Some of the key issues that need = to be solved in 2002 include:

10      =            Budget

The total budget, including contingencies, available to the WAterSPS sub-component 1.2 for the period 2001-2005 is DKK 12,700,000. The original and updated breakdown of this bud= get is shown in Table 10.1.

Table= 10.1: Original and Updated Budget Breakdown

 

Notes:

The budget heads for: National St= aff; Travel & Transport; and CERWASS HRD were combined under Training and St= aff Costs in the original sub-component budget. In the updated budget, these are listed separately for the purpose of clarity.

The budget head for “communication” is changed to “information” to refl= ect the planned focus of activities. “Local consultants” is updated= to “National TA”.

Revisions to budget heads are bas= ed on observed spending patterns during the inception phase and the anticipated volume of activities to be developed.

Revisions to budget heads are dis= cussed in detail under inputs in section 5.1

The present DKK/USD exchange rate= of 8.1, when compared to the exchange rate at the time of approval, lowers the available budget to be spent in Vietnam in USD by 144,532 and the total ove= rall budget to USD 1,669,754. [The budget head for the international consultants= is fixed in DKK and is not subject to currency fluctuations].

The chart of accounts breakdown t= he budget heads into budget sub-heads for the purpose of internal monitoring.<= /span>


10.1=           5-Year Budget<= /h2>

Table 10.2: Original Five Years Bu= dget

 

Table 10.3: Updated Five Years Bud= get

 

Figure 10.1: Cumulative Original a= nd Updated Five Years Budget

 

10.110.2          Budget for 2= 001

Table 10.4: Approved Budget 2001

 

Table 10.5: Rolling Budget 2001

 

Table 10.6: Actual Expenditure 200= 1

 

Figure 10.2: Budgets and Expenditu= re 2001

Appendix 1= :  Original Logical Framework

Narrative Description

Verifiable Indicators

Means of Verification

Objectives of sub-component:

Assist in the establishment of capability of CERWASS to implement the NRWSSS in a cost effective manner and in accordance with the overall political/institution= al framework and the lessons learned in a number of pilot schemes in selected communes, districts and provinces.

 

q       A National Programme 2005-2010 in accorda= nce with NRWSSS approved by 2004

q       A National Fund for RWSS used by GOV and Donors to channel funds for RWSS investments undertaken by user organisat= ions

q       Competent staff at all levels capable to fulfill their new roles and responsibilities

 

Impact assessment in evaluation report by October 2004

Output 1

RWSSS Office establish= ed in CERWASS

 

Inspection/progress re= port

 

Minutes of meeting in Steering Committee

Output 2

Awareness and acceptan= ce of NRWSSS at all relevant levels in GOV and Mass Organisations at HQ, Province, District and Commune Level

 

Satisfactory reports f= rom workshops, seminars and other awareness raising activities

 

Minutes of meetings in Steering Committee

Output 3

Awareness of NRWSSS procedures and roles and responsibilities of user organisations

 

Applications from User Organisations

 

MIS and sub-component quarterly report

Output 4

National Fund for Rural Water Supply and Sanitation established on pilot basis<= /p>

 

Fund Organisation, management, regulation and procedures in place and approved by GOV

 

Fund Regulation/Ordina= nce

Output 5

Study of Institutional Development and Organisational and HRD requirements

 

Recommendations of Stu= dy approved by SPS Steering Committee

 

Minutes of SPS steering Committee

Output 6

HRD Programme

 

HRD Programme approved= by SPS Steering Committee

 

Minutes of SPS Steering Committee

Output 7

Institutional and Organizational Development Plan and Programme

 

Institutional and organisational  plan and pro= gramme approved by SPS Steering Committee

 

Minutes of SPS Steering Committee

Output 8

New Concepts, Guidelin= es and Procedures developed and incorporated in design of pilot projects

 

Design of Pilot Schemes approved by SPS Steering Committee

 

Minutes of SPS Steering Committee

Output 9

Lessons learnt from first generation of Pilot Projects in few comm= unes documented in evaluation report

 

Evaluation of Lessons learnt in SPS Review

 

Evaluation report=

Output 10

Second generation of P= ilot Projects in 3-4 Districts in Dak Lak and Ha Tinh

 

Scheme Progress Report= ing

 

Quarterly Progress Rep= orts from Provinces

Output 11

Lessons learnt from second  generation of Pilot documented in evaluation report

 

Evaluation of Lessons learnt in SPS Review

 

Evaluation report=

Output 12

Plan for Nationwide replication with adjustments for lessons learnt

 

National seminars disseminates and discusses draft plan with widely acceptable guidelines a= nd procedures for Nation Wide implementation of the NRWSSS=

 

Recommendation of Semi= nar reports

 

Appendix 2= :  Functions of CERWASS

Under the as= signment of MARD, the functions of CERWASS, as officially presented, are to:

Appendix 3= :  Approach to Capacity Building

[The text in this appendix has be= en reproduced from Carl Bro’s proposal for “support to implementat= ion of rural water supply and sanitation, Vietnam”]

Aspects of Capacity Buildi= ng

A number of aspects need to be as= sessed in order to determine the focus of capacity building efforts. It is our experience that the following five inter-related areas are of particular importance:

Training Principles=

The Component Description for Nat= ional Capacity Building within the Water Sector contains a list of very relevant = and generally accepted approaches and tools in relation to training/ capacity building. As mentioned in the Component Description, the most relevant of t= hese approaches and tools will need to be selected and to be adjusted to the particular situation. We suggest that the whole list is reviewed and discus= sed with relevant organisations in connection with the Organisational and HRD Study. We will, however, refer to some of the approaches and tools in this section.

Learner-based Approach

Our proposed overall approach to = training is an action-oriented and “learner-based” model that is based u= pon the following five principles:

Training Methods and Tools=

On-the-Job Training

On-the-job training is part of the “learning-by-doing” approach mentioned above. Wherever possible, local counterparts and local consultants will be “twinned”, or = work closely on a day-to-day basis, with the international specialist within the= ir respective technical discipline.  This type of twinning approach is particularly important where international inputs are relatively short. On-the-job training, inspiration= and international experience will also be provided to small Working Groups, whi= ch we suggest are established for very specific purposes, e.g. the development= of a gender strategy, guidelines for IEC activities, manuals on different technology options, procedures for tendering etc. To ensure that our traini= ng approaches are implemented effectively, we will propose to the SMG and PCUs that expli= cit training and knowledge transfer responsibilities are incorporated into the Terms of Reference of our international specialists and also into the Terms= of Reference for local consultants.

Workshops and Seminars

We consider workshops and seminar= s as an important tool for capacity building and have in our more detailed methodol= ogy suggested these in connection with several activities. During the National = RWSS Strategy Study we found workshops and seminars very useful. Some of them we= re organised in order to discuss the existing situation within the RWSS sector= and identify issues of particular relevance for the National RWSS Strategy. Oth= er workshops and seminars focused on a particular issue. It was our experience from the National RWSS Strategy Study, and also from our involvement in oth= er projects in Vietnam, that the Vietnamese are very keen to learn from international experience. During one of the Strategy Study seminars we had therefore invited senior people from other countries in the region to make small presentations of their experience and to participate in the group and plenum discussions which followed. There is of course a limit to how many workshops and seminars should be organised; if too much time is spent on workshops people may get frustrated that there is too much talk and not eno= ugh action and concrete results. It is our experience that workshops and semina= rs are relevant for brainstorming, overall planning of activities, discussion = of particular issues etc., but not for the more detailed development of guidelines, procedures etc.

Working Groups

Small working groups will be more suitable for detailed discussions of strategies, guidelines, procedures etc= . We have had good experience with establishment of small working groups in connection with the National RWSS Strategy Study and in connection with a number of other projects in Vietnam. Some of these are more permanent groups which meet regularly to plan activities or discuss particular issues. Other groups have been established on a more ad-hoc basis, for example to plan a particular event, develop specific guidelines, prepare specific training materials etc. As mentioned above, we propose that small working groups are established for very specific purposes, e.g. preparation of guidelines and manuals. We also intends to discuss with CERWASS and other key organisations whether more permanent working groups should be established. Our internatio= nal specialists will participate in discussions in these groups, providing international experience and general inspiration. We suggest that possible local consultants also participate. Capacity building will be an integrated part of the work in these groups

Training Courses

It will be part of the Organisati= onal and HRD Study to assist in identifying relevant training courses for our counterparts and other key staff at different levels. We will use the findi= ngs of a HRD Study carried out in 1998-1999 in preparation for the Danida-suppo= rted Water SPS. The report contains for example information on a number of educa= tion and training institutions in Vietnam which may be able to offer relevant training courses. Furthermore, the Asian Institute of Technology, which has= a branch in Hanoi, offers a wide range of courses which may be relevant. The Medical Universities/Schools in Hanoi, Ho Chi Minh City and Buon Ma Thuot a= re other possible training service providers as are a number of local consulta= nts, vocational training schools etc. The VWU will be able to conduct training courses on the use of participatory methods in connection with community mobilisation and IEC activities. It may also be relevant for a few key staf= f to attend training courses in neighbouring countries.

We anticipate the training course= s to be a mixture of standard training courses already offered by various instituti= ons and more tailor-made courses. When assisting with the planning of more tailor-made courses, we will emphasise the need to use participatory method= s during the courses. It is our experience that presentations and lectures should be combined with group discussions among the participants, where the knowledge, skills and tools presented are related to the situation in the participants’ own organisation or the local RWSS situation. Discussio= n of case studies and practical examples will be an important learning tool, as = will presentations by the participants after group discussions. It will also be important that counterparts, other staff, volunteer motivators, private entrepreneurs etc. can use their new skills during, or immediately after finishing, a training course.

Study Tours

We envisage that study tours will= be organised to other projects within Vietnam. In connection with e.g. the Dal= at and Buon Ma Thuot Water Supply Projects, we have found this to be a very useful, and much appreciated, way of learning from the experience of others, getting inspiration for new activities etc. It is also a good way of establishing formal and informal contacts and networks which can be used af= ter the study tour. Once the implementation of activities have started in the p= ilot districts, it will be relevant to organise study tours to these districts as part of the planning of activities in new districts. Study tours or “= exchange visits” may also be organised within a district. Furthermore, it shou= ld be considered to organise study tours to neighbouring countries for a few counterparts and key staff at national and provincial level. This could be = part of the efforts to establish a regional network.

Trainees

Attachment of trainees from unive= rsities and other educational institutions is another way of building up a future Vietnamese resource base for the Government and private sector. They could either be involved more generally in the planning and implementation of activities at national and/or provincial levels or they could be involved in specific studies or research initiatives. The Component Description for National Capacity Building mentions that faculty members from the Water Resources University could be exposed to study tours and attachments to projects in the field. We fully support this suggestion as a way of promoti= ng the incorporation of practical field experience into the formal educational= and training system.

Co-operation and Co-ordination

Together with the CPMU for the Wa= ter SPS and the Management Group in national CERWASS, we will explore how best to ensure close co-operation with the training and other capacity building activities under other SPS Sub-components, the UNICEF-supported WATSAN programme, the support provided by DFID to IEC activities, the UNDP-World B= ank Water and Sanitation Programme as well as other relevant programmes.=

 

Appendix 4: Enhanced CERWASS Organisation Structure

Proposed thematic units in the CE= RWASS organisation structure to support the implementation of the Strategy.

 

 

Appendix 5: Updated Job Description for the Danida STA

The Danida Senior Technical Advis= er (STA) is the senior adviser to the director of CERWASS which is the executing age= ncy of the WAterSPS sub-component 1.2: support to implementation of the Strateg= y. The STA advises CERWASS and the international technical assistance team contracted by Danida on overall implementation of the sub-component within = the capacity building component of the WAterSPS. The challenge is to transform CERWASS into a learning organisation which can generate the planned outputs= in a participatory work process.

The scope of work of the STA incl= udes but is not limited to the activities below:

The STA is responsible for = policy and strategy dialogue with GoV within the RWSS sector in consultation with = the Danida sector coordinator in the CPMU and the development counsellor in the= RDE

The STA is responsible for integration of Danish development policies and strategies within sub-compon= ent 1.2

The STA is, together with t= he CERWASS director, responsible for work planning and budgeting for sub-compo= nent 1.2

The STA is primarily a gene= ral adviser to the director in CERWASS.

The STA and the CERWASS dir= ector are responsible for progress reporting and financial reporting to the CPMU

The STA is responsible for = general enforcement of rules and regulations at sub-component level

The STA is responsible for = ensuring annual/semi-annual work plans/ budgets for sub-component 1.2 are submitted = to CPMU for approval

The STA and the CERWASS dir= ector prepare draft TOR for inputs by consultants for sub-component 1.2. These ar= e to be prepared two weeks prior to the arrival of the consultant and then discu= ssed with and agreed by the consultant within two days after arrival.

The STA is responsible for personnel management of Danida employed staff in CERWASS, including selecti= on, recruitment, performance assessment, HRD and management.

The STA is responsible for = annual staff appraisal meetings with Danida employed staff in CERWASS.

The STA is responsible for = filing systems and general office management related to sub-component 1.2.<= /p>

The STA liaises and coopera= tes with authorities, departments and other stakeholders at central and provincial levels.

The STA participates in var= ious donor meetings and coordination groups within the RWSS sector.

 

Appendix 6: Draft Job Description for the Carl Bro Team Leader / Community Development and IEC Specialist

General Description

As the only International Special= ist being permanently resident in Vietnam for the first two years of the progra= m, and with substantial inputs during the remaining three years, the Team Lead= er and IEC Specialist will be responsible for the day-to-day planning, managem= ent and monitoring of the multi-disciplinary services provided by the Consultan= t. This will include very close co-operation and co-ordination with the Sub-Component Management Groups at national and provincial levels, the Cent= ral Programme Management Unit, and the Royal Danish Embassy.  She will also have the overall responsibility for financial management of the funds provided under the Consultant’s contract. She will play a major role in team building activities, the development of a sense of ownership, capacity building of l= ocal counterparts and consultants and in the evaluation and dissemination of les= sons learned.  She will provide spe= cific inputs to the development of IEC frameworks, plans and guidelines and to the implementation and monitoring of IEC and community management activities. S= he will also assist with the preparation of gender action plan(s) and provide advice on the incorporation of gender issues in program activities

Roles and functions:

Appendix 7: Functions of the NSC and the CPMU

National Steering Committee

The NSC is responsible for the co-ordination of policies and overall supervision of the WAterSPS implement= ation at the national level, including approval of adjustments, revisions and additions to the WAterSPS.

The functions of the NSC are to:<= /span>

Appendix 8= :  Planned Activities Second Half 2001=

I    = .Establish Strategy Office

WAterSPS Sub-Component 1.2: Support= to Implementation of the National RWSS Strategy            &n= bsp;           3